01 Design Review & Feasibility Assessment
You upload your 3D CAD file (STL, STEP, IGES, etc.).
Our team reviews:
- Part geometry and complexity
- Recommended printing technology (FDM vs SLA vs SLS vs metal)
- Material options for your application
- Potential manufacturing challenges (overhangs, supports, etc.)
- Post-processing requirements
Timeline: 2–4 hours
02 Material & Technology Recommendation
Based on your requirements, we recommend:
- Optimal printing technology for your design
- Best material choice (strength vs cost vs detail)
- Post-processing options to meet your finish requirements
- Lead time and pricing for your chosen configuration
Timeline: Same day, included in quote
03 Instant Quote & Order Confirmation
You receive:
- Detailed quote breakdown (material, printing, post-processing, delivery)
- Lead time and delivery estimate
- Manufacturing specifications and tolerances
- Confirmation of all requirements
Timeline: Within 24 hours
04 Design Preparation & Pre-Print Validation
Our team prepares your file for printing:
- Slicing optimization for your specific printer
- Support structure design (minimized for FDM, eliminated for SLS)
- Build orientation optimization
- Pre-print simulation to catch potential issues
Timeline: 1–2 hours before printing begins
05 Printing & In-Process Quality Monitoring
Your part(s) are printed using the specified technology:
- Printer parameters confirmed and locked
- Printing progress monitored (no unattended failures)
- Material quality verified throughout
- Post-processing preparation begins
Timeline: 1–4 days depending on technology and part size
06 Post-Processing & Finishing
Parts are finished per your specifications:
- Support removal and cleanup
- Sanding, polishing, or surface treatment (if requested)
- Painting, plating, or custom finishing
- Final inspection and quality control
Timeline: 1–3 days (depends on finishing complexity)
07 Quality Inspection & Delivery
Final quality assurance:
- Dimensional verification on critical features
- Surface finish inspection
- Functional testing (if applicable)
- Secure packaging and shipment
Timeline: 1 day